Installation timelines vary based on deployment complexity:

  • Basic Installation (Single Server): 2-4 hours
  • Standard Deployment (Server + Database): 4-8 hours
  • Enterprise Deployment (HA/Clustered): 1-3 days
  • Full Implementation (including policy configuration and integration): 1-2 weeks

These timelines assume pre-validated infrastructure and network prerequisites are met.